METHODOLOGY
Block Diagram Description
From this block diagram, we can look the operation
of flood monitoring system, in this project, we use battery as a main supply to
all component to operate. Sensor 1and sensor 2 are water level sensor to give
the signal to microcontroller PIC and PIC that have been program send the data
to GSM. SCADA is a monitoring system to see the operation or flow of project.
The valve is to control water flow to the tank.
ok! structure your proposal like so:
ReplyDeleteContents
1.Summary/introduction
2.Statement of Problem
3.Objectives
4.Technical Approach
4.1.Generating Design Concepts
4.2.Selecting Design Concept
5.Project Management
5.1 Budget
5.2 Gantt chart
6.Conclusion
7.References
try to fill in all the requirement ! this is your proposal report outline!