Wednesday, 8 February 2012

PROJECT METHODOLOGY



METHODOLOGY


Block Diagram Description


      From this block diagram, we can look the operation of flood monitoring system, in this project, we use        battery as a main supply to all component to operate. Sensor 1and sensor 2 are water level sensor to give the signal to microcontroller PIC and PIC that have been program send the data to GSM. SCADA is a monitoring system to see the operation or flow of project. The valve is to control water flow to the tank.









1 comment:

  1. ok! structure your proposal like so:

    Contents
    1.Summary/introduction
    2.Statement of Problem
    3.Objectives
    4.Technical Approach
    4.1.Generating Design Concepts
    4.2.Selecting Design Concept
    5.Project Management
    5.1 Budget
    5.2 Gantt chart
    6.Conclusion
    7.References

    try to fill in all the requirement ! this is your proposal report outline!

    ReplyDelete